Attestation of conformity AoC
The Construction Products Regulation (CPR) was introduced in 2011 to harmonise performance information on construction products across the European Economic Area (EEA). It is made most visible by the mandatory CE marking of regulated products.
Some parts of the Construction Products Regulation applied from 24 April 2011, but it came into force in full on 1 July 2013. From this time, construction products placed on the market in the EEA that are covered by a harmonised European product standard or a European Technical Assessment need to be CE marked and accompanied by a Declaration of Performance (DoP). This is intended to ensure that reliable technical information is provided about the performance of construction products in a common technical language and tested using consistent assessment methods.
Demonstrating compliance with the regulations requires ‘attestation of conformity’ (AoC). There are five levels of attestation of conformity depending on the nature of the product. The lowest levels (1 or 1+) have the most demanding requirements and might be necessary for products with safety-critical aspects. The highest level (4) is the least demanding and might for example apply to decorative products.
Non-safety critical attestation might be carried out by the manufacturer themselves, whilst safety critical testing might have to be undertaken by a notified body.
[edit] Related articles on Designing Buildings
- Attestation.
- British Standards.
- CE marking.
- Construction Products Regulations.
- European Technical Approval.
- Kitemark.
- Standards.
[edit] External references
- BSI, Construction Products Regulation (CPR).
Featured articles and news
Repairing historic stone and slate roofs
The need for a code of practice and technical advice note.
UKCW London to tackle sector’s most pressing issues
AI and skills development, ecology and the environment, policy and planning and more.
Managing building safety risks
Across an existing residential portfolio; a client's perspective.
ECA support for Gate Safe’s Safe School Gates Campaign.
Core construction skills explained
Preparing for a career in construction.
Retrofitting for resilience with the Leicester Resilience Hub
Community-serving facilities, enhanced as support and essential services for climate-related disruptions.
Some of the articles relating to water, here to browse. Any missing?
Recognisable Gothic characters, designed to dramatically spout water away from buildings.
A case study and a warning to would-be developers
Creating four dwellings... after half a century of doing this job, why, oh why, is it so difficult?
Reform of the fire engineering profession
Fire Engineers Advisory Panel: Authoritative Statement, reactions and next steps.
Restoration and renewal of the Palace of Westminster
A complex project of cultural significance from full decant to EMI, opportunities and a potential a way forward.
Apprenticeships and the responsibility we share
Perspectives from the CIOB President as National Apprentice Week comes to a close.
The first line of defence against rain, wind and snow.
Building Safety recap January, 2026
What we missed at the end of last year, and at the start of this.



















